UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 10-K

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE

SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2012

OR

o TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE

SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File Number 001-00368

Chevron Corporation

(Exact name of registrant as specified in its charter)

Delaware

94-0890210

6001 Bollinger Canyon Road,

San Ramon, California 94583-2324

(State or other jurisdiction of

incorporation or organization)

(I.R.S. Employer

Identification No.)

(Address of principal executive offices) (Zip Code)

Registrant s telephone number, including area code (925) 842-1000

Securities registered pursuant to Section 12 (b) of the Act:

Title of Each Class

Name of Each Exchange

on Which Registered

Common stock, par value $.75 per share

New York Stock Exchange, Inc.

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes No o

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Yes o No

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes No o

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T ( 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes No o

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K ( 229.405 of this chapter) is not contained herein, and will not be contained, to the best of registrant s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of large accelerated filer, accelerated filer and smaller reporting company in Rule 12b-2 of the Exchange Act.

Large accelerated filer

Accelerated filer o

Non-accelerated filer o

(Do not check if a smaller

reporting company)

Smaller reporting company o

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes o No

Aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the price at which the common equity was last sold, or the average bid and asked price of such common equity, as of the last business day of the registrant s most recently completed second fiscal quarter $207,005,770,000 (As of June 29, 2012)

Number of Shares of Common Stock outstanding as of February 11, 2013 1,942,697,787

DOCUMENTS INCORPORATED BY REFERENCE

(To The Extent Indicated Herein)

Notice of the 2013 Annual Meeting and 2013 Proxy Statement, to be filed pursuant to Rule 14a-6(b) under the Securities Exchange Act of 1934, in connection with the company s 2013 Annual Meeting of Stockholders (in Part III)

TABLE OF CONTENTS

ITEM

PAGE NO.

PART I

1.

Business

General Development of Business

Description of Business and Properties

Capital and Exploratory Expenditures

Upstream

Downstream

24

Other Businesses

26

Web Site Access to SEC Reports

28

1A.

Risk Factors

28

1B.

Unresolved Staff Comments

30

2.

Properties

30

3.

Legal Proceedings

30

4.

Mine Safety Disclosures

30

PART II

5.

Market for the Registrant s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

31

6.

Selected Financial Data

31

7.

Management s Discussion and Analysis of Financial Condition and Results of Operations

31

7A.

Quantitative and Qualitative Disclosures About Market Risk

31

8.

Financial Statements and Supplementary Data

31

9.

Changes in and Disagreements With Accountants on Accounting and Financial Disclosure

32

9A.

Controls and Procedures

32

9B.

Other Information

32

PART III

10.

Directors, Executive Officers and Corporate Governance

33

11.

Executive Compensation

34

12.

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

34

13.

Certain Relationships and Related Transactions, and Director Independence

34

14.

Principal Accounting Fees and Services

34

PART IV

15.

Exhibits, Financial Statement Schedules

35

Schedule II Valuation and Qualifying Accounts

36

Signatures

37

EX-10.9

EX-24.9

EX-10.13

EX-31.1

EX-10.16

EX-31.2

EX-12.1

EX-32.1

EX-21.1

EX-32.2

EX-23.1

EX-95

EX-24.1

EX-99.1

EX-24.2

EX-101 INSTANCE DOCUMENT

EX-24.3

EX-101 SCHEMA DOCUMENT

EX-24.4

EX-101 CALCULATION LINKBASE DOCUMENT

EX-24.5

EX-101 LABELS LINKBASE DOCUMENT

EX-24.6

EX-101 PRESENTATION LINKBASE DOCUMENT

EX-24.7

EX-101 DEFINITION LINKBASE DOCUMENT

EX-24.8

CAUTIONARY STATEMENT RELEVANT TO FORWARD-LOOKING INFORMATION

FOR THE PURPOSE OF SAFE HARBOR PROVISIONS OF THE

PRIVATE SECURITIES LITIGATION REFORM ACT OF 1995

This Annual Report on Form 10-K of Chevron Corporation contains forward-looking statements relating to Chevron s operations that are based on management s current expectations, estimates and projections about the petroleum, chemicals and other energy-related industries. Words such as anticipates, expects, intends, plans, targets, forecasts, projects, believes, seeks, schedules, estimates, budgets, outlook and similar expressions are intended to identify such forward-looking statements. These statements are not guarantees of future performance and are subject to certain risks, uncertainties and other factors, many of which are beyond the company s control and are difficult to predict. Therefore, actual outcomes and results may differ materially from what is expressed or forecasted in such forward-looking statements. The reader should not place undue reliance on these forward-looking statements, which speak only as of the date of this report. Unless legally required, Chevron undertakes no obligation to update publicly any forward-looking statements, whether as a result of new information, future events or otherwise.

Among the important factors that could cause actual results to differ materially from those in the forward-looking statements are: changing crude oil and natural gas prices; changing refining, marketing and chemicals margins; actions of competitors or regulators; timing of exploration expenses; timing of crude oil liftings; the competitiveness of alternate-energy sources or product substitutes; technological developments; the results of operations and financial condition of equity affiliates; the inability or failure of the company s joint-venture partners to fund their share of operations and development activities; the potential failure to achieve expected net production from existing and future crude oil and natural gas development projects; potential delays in the development, construction or start-up of planned projects; the potential disruption or interruption of the company s production or manufacturing facilities or delivery/transportation networks due to war, accidents, political events, civil unrest, severe weather or crude oil production quotas that might be imposed by the Organization of Petroleum Exporting Countries; the potential liability for remedial actions or assessments under existing or future environmental regulations and litigation; significant investment or product changes required by existing or future environmental statutes, regulations and litigation; the potential liability resulting from other pending or future litigation; the company s future acquisition or disposition of assets and gains and losses from asset dispositions or impairments; government-mandated sales, divestitures, recapitalizations, industry-specific taxes, changes in fiscal terms or restrictions on scope of company operations; foreign currency movements compared with the U.S. dollar; the effects of changed accounting rules under generally accepted accounting principles promulgated by rule-setting bodies; and the factors set forth under the heading Risk Factors on pages 28 through 30 in this report. In addition, such results could be affected by general domestic and international economic and political conditions. Other unpredictable or unknown factors not discussed in this report could also have material adverse effects on forward-looking statements.

PART I

Item 1. Business

General Development of Business

Summary Description of Chevron

Chevron Corporation,* a Delaware corporation, manages its investments in subsidiaries and affiliates and provides administrative, financial, management and technology support to U.S. and international subsidiaries that engage in fully integrated petroleum operations, chemicals operations, mining activities, power generation and energy services. Upstream operations consist primarily of exploring for, developing and producing crude oil and natural gas; processing, liquefaction, transportation and regasification associated with liquefied natural gas; transporting crude oil by major international oil export pipelines; transporting, storage and marketing of natural gas; and a gas-to-liquids project. Downstream operations consist primarily of refining crude oil into petroleum products; marketing of crude oil and refined products; transporting crude oil and refined products by pipeline, marine vessel, motor equipment and rail car; and manufacturing and marketing of commodity petrochemicals, plastics for industrial uses and fuel and lubricant additives.

A list of the company s major subsidiaries is presented on pages E-4 and E-5. As of December 31, 2012, Chevron had approximately 62,000 employees (including about 3,700 service station employees). Approximately 31,000 employees (including about 3,400 service station employees), or 50 percent, were employed in U.S. operations.

Overview of Petroleum Industry

Petroleum industry operations and profitability are influenced by many factors. Prices for crude oil, natural gas, petroleum products and petrochemicals are generally determined by supply and demand. The members of the Organization of Petroleum Exporting Countries (OPEC) are typically the world s swing producers of crude oil and their production levels are a major factor in determining worldwide supply. Demand for crude oil and its products and for natural gas is largely driven by the conditions of local, national and global economies, although weather patterns and taxation relative to

other energy sources also play a significant part. Laws and governmental policies, particularly in the areas of taxation, energy and the environment affect where and how companies conduct their operations and formulate their products and, in some cases, limit their profits directly.

Strong competition exists in all sectors of the petroleum and petrochemical industries in supplying the energy, fuel and chemical needs of industry and individual consumers. Chevron competes with fully integrated, major global petroleum companies, as well as independent and national petroleum companies, for the acquisition of crude oil and natural gas leases and other properties and for the equipment and labor required to develop and operate those properties. In its downstream business, Chevron competes with fully integrated, major petroleum companies and other independent refining, marketing, transportation and chemicals entities and national petroleum companies in the sale or acquisition of various goods or services in many national and international markets.

Operating Environment

Refer to pages FS-2 through FS-8 of this Form 10-K in Management s Discussion and Analysis of Financial Condition and Results of Operations for a discussion of the company s current business environment and outlook.

Chevron s Strategic Direction

Chevron s primary objective is to create shareholder value and achieve sustained financial returns from its operations that will enable it to outperform its competitors. In the upstream, the company s strategies are to grow profitably in core areas, build new legacy positions and commercialize the company s equity natural gas resource base while growing a high-impact global natural gas business. In the downstream, the strategies are to improve returns and grow earnings across the value chain. The company also continues to utilize technology across all its businesses to differentiate performance, and to invest in profitable renewable energy and energy efficiency solutions.

___________________________________

Incorporated in Delaware in 1926 as Standard Oil Company of California, the company adopted the name Chevron Corporation in 1984 and ChevronTexaco Corporation in 2001. In 2005, ChevronTexaco Corporation changed its name to Chevron Corporation. As used in this report, the term Chevron and such terms as the company, the corporation, our, we and us may refer to Chevron Corporation, one or more of its consolidated subsidiaries, or all of them taken as a whole, but unless stated otherwise they do not include affiliates of Chevron i.e., those companies accounted for by the equity method (generally owned 50 percent or less) or investments accounted for by the cost method. All of these terms are used for convenience only and are not intended as a precise description of any of the separate companies, each of which manages its own affairs.

Description of Business and Properties

The upstream and downstream activities of the company and its equity affiliates are widely dispersed geographically, with operations and projects* in North America, South America, Europe, Africa, Asia and Australia. Tabulations of segment sales and other operating revenues, earnings and income taxes for the three years ending December 31, 2012, and assets as of the end of 2012 and 2011 for the United States and the company s international geographic areas are in Note 10 to the Consolidated Financial Statements beginning on page FS-36. Similar comparative data for the company s investments in and income from equity affiliates and property, plant and equipment are in Notes 11 and 12 on pages FS-38 through FS-40.

Capital and Exploratory Expenditures

Total expenditures for 2012 were $34.2 billion, including $2.1 billion for the company s share of equity-affiliate expenditures. In 2011 and 2010, expenditures were $29.1 billion and $21.8 billion, respectively, including the company s share of affiliates expenditures of $1.7 billion in 2011 and $1.4 billion in 2010.

Of the $34.2 billion in expenditures for 2012, 89 percent, or $30.4 billion, was related to upstream activities. Approximately 89 and 87 percent was expended for upstream operations in 2011 and 2010, respectively. International upstream accounted for about 72 percent of the worldwide upstream investment in 2012, about 68 percent in 2011 and about 82 percent in 2010. These amounts exclude the acquisition of Atlas Energy, Inc., in 2011.

In 2013, the company estimates capital and exploratory expenditures will be $36.7 billion, including $3.3 billion of spending by affiliates. Approximately 90 percent of the total, or $33 billion, is budgeted for exploration and production activities, with $25.5 billion, or about 70 percent, of this amount for projects outside the United States.

Refer also to a discussion of the company s capital and exploratory expenditures on page FS-12.

Upstream

The table on the following page summarizes the net production of liquids and natural gas for 2012 and 2011 by the company and its affiliates. Worldwide oil-equivalent production was 2.610 million barrels per day, down about 2 percent from 2011. The decrease was mainly associated with normal field declines, the shut-in of the Frade Field in Brazil, and a major planned turnaround at the Tengizchevroil facilities in Kazakhstan. The start-up and ramp-up of several major capital projects the Platong II natural gas project in Thailand, the Usan and Agbami 2 projects in Nigeria, and the Perdido, Tahiti 2 and Caesar/Tonga projects in the U.S. Gulf of Mexico partially offset the decrease in net production from 2011. Refer to the Results of Operations section beginning on page FS-6 for a detailed discussion of the factors explaining the 2010 through 2012 changes in production for crude oil and natural gas liquids, and natural gas.

The company estimates its average worldwide oil-equivalent production in 2013 will be approximately 2.650 million barrels per day based on an average Brent price of $112 per barrel in 2012. This estimate is subject to many factors and uncertainties, including quotas that may be imposed by OPEC, price effects on entitlement volumes, changes in fiscal terms or restrictions on the scope of company operations, delays in project start-ups and ramp-ups, fluctuations in demand for natural gas in various markets, weather conditions that may shut in production, civil unrest, changing geopolitics, delays in completion of maintenance turnarounds, greater-than-expected declines in production from mature fields, or other disruptions to operations. The longer-term outlook for production levels is also affected by the size and number of economic investment opportunities and, for new, large-scale projects, the time lag between initial exploration and the beginning of production. Refer to the Review of Ongoing Exploration and Production Activities in Key Areas, beginning on page 9, for a discussion of the company s major crude oil and natural gas development projects.

___________________________________

As used in this report, the term project may describe new upstream development activity, individual phases in a multiphase development, maintenance activities, certain existing assets, new investments in downstream and chemicals capacity, investments in emerging and sustainable energy activities, and certain other activities. All of these terms are used for convenience only and are not intended as a precise description of the term project as it relates to any specific governmental law or regulation.

Net Production of Crude Oil and Natural Gas Liquids and Natural Gas 1

Components of Oil-Equivalent

Crude Oil & Natural Gas

Oil-Equivalent (Thousands

Liquids (Thousands of

Natural Gas (Millions

of Barrels per Day)

Barrels per Day)

of Cubic Feet per Day)

2012

2011

2012

2011

2012

2011

United States

655

678

455

465

1,203

1,279

Other Americas

Argentina

22

27

21

26

Brazil

35

33

13

Canada

69

70

68

69

Colombia

36

39

216

234

Trinidad and Tobago

29

31

173

183

Total Other Americas

162

202

95

128

399

438

Africa

Angola

137

147

128

139

53

50

Chad

23

26

22

25

Democratic Republic of the Congo

Nigeria

269

260

242

236

165

142

Republic of the Congo

19

23

17

21

13

10

Total Africa

451

459

411

424

238

209

Asia

Azerbaijan

28

28

26

26

10

10

Bangladesh

94

74

550

434

China

21

22

20

20

10

Indonesia

198

208

158

166

236

253

Kazakhstan

61

62

37

38

139

144

Myanmar

16

14

94

86

Partitioned Zone2

90

91

86

88

21

20

Philippines

24

25

120

126

Thailand

243

209

67

65

1,060

867

Total Asia

775

733

400

409

2,239

1,950

Australia

99

101

28

26

428

448

Europe

Denmark

36

44

24

29

74

91

Netherlands

42

31

Norway

United Kingdom

66

85

46

59

122

155

Total Europe

114

139

75

93

239

278

Total Consolidated Companies

2,256

2,312

1,464

1,545

4,746

4,602

Equity Affiliates3

354

361

300

304

328

339

Total Including Affiliates4

2,610

2,673

1,764

1,849

5,074

4,941

1 Includes synthetic oil: Canada, net

43

40

43

40

Venezuelan affiliate, net

17

32

17

32

2 Located between Saudi Arabia and Kuwait.

3 Volumes represent Chevron s share of production by affiliates, including Tengizchevroil in Kazakhstan and Petroboscan, Petroindependiente and Petropiar in Venezuela.

4 Volumes include natural gas consumed in operations of 586 million and 582 million cubic feet per day in 2012 and 2011, respectively. Total as sold natural gas volumes were 4,488 million and 4,359 million cubic feet per day for 2012 and 2011, respectively.

Average Sales Prices and Production Costs per Unit of Production

Refer to Table IV on page FS-67 for the company s average sales price per barrel of crude oil, condensate and natural gas liquids and per thousand cubic feet of natural gas produced, and the average production cost per oil-equivalent barrel for 2012, 2011 and 2010.

Gross and Net Productive Wells

The following table summarizes gross and net productive wells at year-end 2012 for the company and its affiliates:

Productive Oil and Gas Wells at December 31, 2012

Productive

Productive

Oil Wells

Gas Wells

Gross

Net

Gross

Net

United States

50,180

32,758

14,248

7,737

Other Americas

736

548

48

28

Africa

2,579

861

17

Asia

13,127

11,335

3,148

1,924

Australia

815

458

65

11

Europe

330

97

227

48

Total Consolidated Companies

67,767

46,057

17,753

9,755

Equity Affiliates

1,300

456

Total Including Affiliates

69,067

46,513

17,760

9,757

Multiple completion wells included above

876

602

407

369

Reserves

Refer to Table V beginning on page FS-67 for a tabulation of the company s proved net crude oil and natural gas reserves by geographic area, at the beginning of 2010 and each year-end from 2010 through 2012. Reserves governance, technologies used in establishing proved reserves additions, and major changes to proved reserves by geographic area for the three-year period ended December 31, 2012, are summarized in the discussion for Table V. Discussion is also provided regarding the nature of, status of and planned future activities associated with the development of proved undeveloped reserves. The company recognizes reserves for projects with various development periods, sometimes exceeding five years. The external factors that impact the duration of a project include scope and complexity, remoteness or adverse operating conditions, infrastructure constraints, and contractual limitations.

The net proved reserve balances at the end of each of the three years 2010 through 2012 are shown in the following table.

Net Proved Reserves at December 31

2012

2011

2010

Liquids Millions of barrels

Consolidated Companies

4,353

4,295

4,270

Affiliated Companies

2,128

2,160

2,233

Total Liquids

6,481

6,455

6,503

Natural Gas Billions of cubic feet

Consolidated Companies

25,654

25,229

20,755

Affiliated Companies

3,541

3,454

3,496

Total Natural Gas

29,195

28,683

24,251

Oil-Equivalent Millions of barrels

Consolidated Companies

8,629

8,500

7,729

Affiliated Companies

2,718

2,736

2,816

Total Oil-Equivalent

11,347

11,236

10,545

Acreage

At December 31, 2012, the company owned or had under lease or similar agreements undeveloped and developed crude oil and natural gas properties throughout the world. The geographical distribution of the company s acreage is shown in the following table.

Acreage at December 31, 2012

(Thousands of Acres)

Developed and

Undeveloped*

Developed

Undeveloped

Gross

Net

Gross

Net

Gross

Net

United States

6,399

5,161

7,788

5,008

14,187

10,169

Other Americas

26,913

15,898

1,348

365

28,261

16,263

Africa

8,848

3,840

3,328

1,373

12,176

5,213

Asia

30,795

14,189

1,487

857

32,282

15,046

Australia

11,427

5,728

918

239

12,345

5,967

Europe

5,481

4,153

648

126

6,129

4,279

Total Consolidated Companies

89,863

48,969

15,517

7,968

105,380

56,937

Equity Affiliates

938

430

259

102

1,197

532

Total Including Affiliates

90,801

49,399

15,776

8,070

106,577

57,469

The gross undeveloped acres that will expire in 2013, 2014 and 2015 if production is not established by certain required dates are 1,254, 3,629 and 3,141, respectively.

Delivery Commitments

The company sells crude oil and natural gas from its producing operations under a variety of contractual obligations. Most contracts generally commit the company to sell quantities based on production from specified properties, but some natural gas sales contracts specify delivery of fixed and determinable quantities, as discussed below.

In the United States, the company is contractually committed to deliver to third parties 192 billion cubic feet of natural gas through 2015. The company believes it can satisfy these contracts through a combination of equity production from the company s proved developed U.S. reserves and third-party purchases. These commitments include a variety of pricing terms, including both indexed and fixed-price contracts.

Outside the United States, the company is contractually committed to deliver a total of 791 billion cubic feet of natural gas to third parties from 2013 through 2015 for operations in Australia, Colombia, Denmark and the Philippines. These sales contracts contain variable pricing formulas that are generally referenced to the prevailing market price for crude oil, natural gas or other petroleum products at the time of delivery. The company believes it can satisfy these contracts from quantities available from production of the company s proved developed reserves in these countries.

Development Activities

Refer to Table I on page FS-62 for details associated with the company s development expenditures and costs of proved property acquisitions for 2012, 2011 and 2010.

The following table summarizes the company s net interest in productive and dry development wells completed in each of the past three years, and the status of the company s development wells drilling at December 31, 2012. A development well is a well drilled within the proved area of a crude oil or natural gas reservoir to the depth of a stratigraphic horizon known to be productive.

Development Well Activity

Wells Drilling

Net Wells Completed

at 12/31/12

2012

2011

2010

Gross

Net

Prod.

Dry

Prod.

Dry

Prod.

Dry

United States

78

45

941

909

634

Other Americas

13

50

37

32

Africa

10

23

29

33

Asia

75

35

566

15

549

15

445

15

Australia

Europe

Total Consolidated Companies

189

94

1,589

21

1,530

24

1,148

22

Equity Affiliates

26

25

Total Including Affiliates

195

97

1,615

21

1,555

24

1,156

22

Exploration Activities

Refer to Table I on page FS-62 for detail on the company s exploration expenditures and costs of unproved property acquisitions for 2012, 2011 and 2010.

The following table summarizes the company s net interests in productive and dry exploratory wells completed in each of the last three years, and the number of exploratory wells drilling at December 31, 2012. Exploratory wells are wells drilled to find and produce crude oil or natural gas in unproved areas and include delineation and appraisal wells, which are wells drilled to find a new reservoir in a field previously found to be productive of crude oil or natural gas in another reservoir or to extend a known reservoir beyond the proved area.

Exploratory Well Activity

Wells Drilling

Net Wells Completed

at 12/31/12

2012

2011

2010

Gross

Net

Prod.

Dry

Prod.

Dry

Prod.

Dry

United States

11

Other Americas

Africa

Asia

12

10

Australia

Europe

Total Consolidated Companies

17

12

29

21

12

Equity Affiliates

Total Including Affiliates

17

12

29

22

12

Review of Ongoing Exploration and Production Activities in Key Areas

Chevron s 2012 key upstream activities, some of which are also discussed in Management s Discussion and Analysis of Financial Condition and Results of Operations, beginning on page FS-2, are presented below. The comments include references to total production and net production, which are defined under Production in Exhibit 99.1 on page E-11.

The discussion that follows references the status of proved reserves recognition for significant long-lead-time projects not on production and for projects recently placed on production. Reserves are not discussed for exploration activities or recent discoveries that have not advanced to a project stage, or for mature areas of production that do not have individual projects requiring significant levels of capital or exploratory investment. Amounts indicated for project costs represent total project costs, not the company s share of costs for projects that are less than wholly owned.

Chevron has exploration and production activities in most of the world s major hydrocarbon basins. The company s upstream strategy is to grow profitably in core areas, build new legacy positions and commercialize the company s equity natural gas resource base while growing a high-impact global natural gas business. The map above indicates Chevron s primary areas for exploration and production.

United States

Upstream activities in the United States are concentrated in California, the Gulf of Mexico, Colorado, Louisiana, Michigan, New Mexico, Ohio, Oklahoma, Pennsylvania, Texas, West Virginia, and Wyoming. Average net oil-equivalent production in the United States during 2012 was 655,000 barrels per day.

In California, the company has significant production in the San Joaquin Valley. In 2012, net daily production averaged 163,000 barrels of crude oil, 70 million cubic feet of natural gas and 4,000 barrels of natural gas liquids (NGLs). Approximately

86 percent of the crude oil production is considered heavy oil (typically with API gravity lower than 22 degrees).

During 2012, net daily production for the company s combined interests in the Gulf of Mexico shelf and deepwater areas, and the onshore fields in the region, was 153,000 barrels of crude oil, 395 million cubic feet of natural gas and 16,000 barrels of NGLs.

Chevron was engaged in various exploration and development activities in the deepwater Gulf of Mexico during 2012. The Jack and St. Malo fields are located within 25 miles of each other and are being jointly developed. Chevron has a 50 percent interest in the Jack Field, a 51 percent interest in the St. Malo Field and a 50.7 percent interest in the production host facility. Both fields are company operated. Drilling operations progressed during 2012, with five of 10 planned wells drilled. At the end of 2012, project activities were more than 57 percent complete, with subsea and floating production unit installation activities expected in second-half 2013. The facility is planned to have a design capacity of 177,000 barrels of oil-equivalent per day to accommodate production from the Jack/St. Malo development, which is estimated to have maximum total daily production of 94,000 barrels of oil equivalent, plus production from a nearby third-party field. Total project costs for the initial phase of development are estimated at $7.5 billion and start-up is expected in 2014. The fields have an estimated production life of 30 years. Proved reserves have been recognized for this project.

In 2012, an evaluation of additional development opportunities was initiated for the Jack and St. Malo fields. Stage 2, the first phase of future development work, is expected to include four additional development wells, two each at the Jack and the St. Malo fields. Front-end engineering and design (FEED) activities are planned to begin in mid-2013. At the end of 2012, proved reserves had not been recognized for the Jack/St. Malo Stage 2 project.

Fabrication and development drilling continued in 2012 for the 60 percent-owned and operated Big Foot project. The development plan includes a 15-slot drilling and production platform with water injection facilities and a design capacity of 79,000 barrels of oil equivalent per day. At the end of 2012, project activities were 68 percent complete, and topside module installation is planned for mid-2013. First production is anticipated in 2014. The field has an estimated production life of 20 years. Proved reserves have been recognized for this project.

Tahiti 2 is the second development phase for the 58 percent-owned and operated Tahiti Field, and is designed to increase recovery and return production to more than 100,000 barrels of crude oil per day. The project includes two additional production wells, three water injection wells and water injection facilities. Drilling commenced on the first production well in early 2012, and water injection began in first quarter 2012. Start-up of the first production well is expected by third quarter 2013. Proved reserves have been recognized for the Tahiti 2 project, and the field has an estimated production life of 30 years.

The company has a 42.9 percent nonoperated working interest in the Tubular Bells Field. Development drilling began in second quarter 2012, and plans include three producing and two injection wells, with a subsea tieback to a third-party production facility. First oil is anticipated in 2014, and maximum total daily production is expected to reach 40,000 to 45,000 barrels of oil-equivalent. The field has an estimated production life of 25 years. The initial recognition of proved reserves for the project occurred in 2012.

Chevron has a 20.3 percent nonoperated working interest in the Caesar and Tonga area. First production occurred in first quarter 2012, and maximum total daily production reached about 62,000 barrels of oil-equivalent by year-end 2012. Drilling operations on the fourth development well concluded in early 2013, and the well is expected to commence production in second quarter 2013.

The company has a 15.6 percent nonoperated working interest in the Mad Dog II Project. FEED commenced in second quarter 2012 and a final investment decision is expected in 2014. The project includes the construction and installation of a new production and drilling spar facility and is expected to add incremental maximum total daily production of 120,000 to 140,000 barrels of oil equivalent. At the end of 2012, proved reserves had not been recognized for this project.

In 2012, Chevron signed commercial agreements for the Stampede project allowing for the joint development of the Knotty Head and Pony fields. Chevron holds a 20 percent nonoperated working interest in this joint development. The project is expected to enter FEED by mid-2013. At the end of 2012, proved reserves had not been recognized for this project.

Deepwater exploration activities in 2012 included participation in three exploratory wells one appraisal and two wildcats. Drilling began on an appraisal well at the

43.8 percent-owned and operated Moccasin discovery in fourth quarter 2012. Drilling activities were placed on hold in early 2013 for equipment repair and are expected to resume later this year. Moccasin and the 55 percent-owned and operated Buckskin discovery, located 12 miles apart, could be jointly developed upon the successful completion of additional appraisal drilling planned for 2013. A second Coronado wildcat well began drilling in second quarter 2012, targeting the lower Tertiary Wilcox formation. Drilling was completed in February 2013, and the results are under evaluation. Chevron also had a 20 percent nonoperated working interest in the Hummer Shallow wildcat well.

Chevron added 15 leases to the deepwater portfolio as a result of awards from the central Gulf of Mexico lease sale in mid-2012. In addition, Chevron submitted the highest bids on 28 additional deepwater leases at the western Gulf of Mexico lease sale in late 2012.

Besides the activities connected with development and exploration projects in the Gulf of Mexico, the company also has contracted liquefied natural gas (LNG) offloading, storage and regasification capacity at the Sabine Pass LNG facility and natural gas transportation capacity in a third-party pipeline system connecting the terminal to the U.S. natural gas pipeline grid.

10

Company activities in the mid-continental United States include operated and nonoperated interests in properties primarily in Colorado, New Mexico, Oklahoma, Texas and Wyoming. During 2012, the company s net daily production in these areas averaged 90,000 barrels of crude oil, 600 million cubic feet of natural gas and 29,000 barrels of NGL's.

In West Texas, the company continues to pursue development of tight oil and liquids-rich shale resources in the Midland Basin s Wolfcamp play and several plays in the Delaware Basin through use of advanced drilling and completion technologies. Additional production growth is expected from interests in these formations in future years. In October 2012, an acquisition of more than 350,000 gross acres in New Mexico augmented the company's leasehold position in the Delaware Basin and surrounding areas.

The company holds leases in the Marcellus Shale and Utica Shale, primarily located in southwestern Pennsylvania, Ohio, and West Virginia, and in the Antrim Shale in Michigan. During 2012, the company's net daily production in these areas averaged approximately 138 million cubic feet of natural gas. In 2012, development of the Marcellus Shale proceeded at a measured pace, focused on improving execution capability and reservoir understanding. Activities in the Utica Shale during 2012 included acquisition of regional seismic data in eastern Ohio to identify core areas. The company commenced drilling on four exploratory wells during the year. This initial activity was focused on acquiring data necessary for potential future development. The company also holds a 49 percent interest in Laurel Mountain Midstream, LLC, an affiliate that owns more than 1,200 miles of natural gas gathering lines servicing the Marcellus.

Other Americas

Other Americas is composed of Argentina, Brazil, Canada, Colombia, Suriname, Trinidad and Tobago, and Venezuela. Net oil-equivalent production from these countries averaged 230,000 barrels per day during 2012, including the company s share of synthetic oil production.

Canada: Chevron has interests in oil sands projects and shale acreage in Alberta, shale acreage and an LNG project in British Columbia, exploration, development and production projects offshore in the Atlantic region, and exploration and discovered resource interests in the Beaufort Sea region of the Northwest Territories. Average net oil-equivalent production during 2012 was 69,000 barrels per day, composed of 25,000 barrels of crude oil, 4 million cubic feet of natural gas and 43,000 barrels of synthetic oil from oil sands.

The company holds a 20 percent nonoperated working interest in the Athabasca Oil Sands Project (AOSP). Oil sands are mined from both the Muskeg River and the Jackpine mines and bitumen is extracted from the oil sands and upgraded into synthetic oil. During 2012, ramp-up from the AOSP Expansion 1 Project continued to boost production toward the total daily design capacity of approximately 255,000 barrels. Additionally, a final investment decision was reached in mid-2012 on the Quest Project, a carbon capture and sequestration project that is designed to capture and store more than one million tons annually of carbon dioxide produced by bitumen processing at the AOSP by 2015.

In February 2013, Chevron acquired a 50 percent-owned and operated interest in the Kitimat LNG project and proposed Pacific Trail Pipeline, and a 50 percent nonoperated working interest in 644,000 total acres in the Horn River and Liard shale gas basins in British Colombia. The Kitimat project is planned to include a two-train, 10.0 million-metric-ton-per-year LNG facility, and at the time of acquisition, FEED activities were in progress.

11

Chevron holds a 26.9 percent nonoperated working interest in the Hibernia Field and a 23.6 nonoperated working interest in the unitized Hibernia Southern Extension (HSE) offshore Atlantic Canada. The HSE development is expected to increase the economic life of the Hibernia Field. Fabrication of topside and subsea equipment progressed in 2012. Full production start-up is expected in 2014. Proved reserves have been recognized for the initial wells drilled.

The company holds a 26.6 percent nonoperated working interest in the heavy-oil Hebron Field, also offshore Atlantic Canada. The development plan includes a concrete, gravity-based platform with a capacity of 150,000 barrels of crude oil per day. The maximum total daily crude oil production is expected to be 134,000 barrels. FEED activities were completed in 2012, and a final investment decision was made in December 2012. Project costs are estimated at $14 billion. The project has an expected economic life of 30 years, and first oil is expected in 2017. The initial recognition of proved reserves for the project occurred in 2012.

During 2012, drilling continued on a multiwell program on the 100 percent-owned and operated leases in the Duvernay shale formation in Alberta. The company also holds exploration licenses and leases in the Flemish Pass and Orphan basins offshore Atlantic Canada and the Beaufort Sea region of the Northwest Territories, including a 35.4 percent nonoperated working interest in the offshore Amauligak discovery.

In addition, Chevron holds interests in the Aitken Creek and Alberta Hub natural gas storage facilities, which have aggregate total capacity of approximately 100 billion cubic feet. These facilities are located in western Canada near the Duvernay, Horn River, Liard and Montney shale gas plays.

Greenland: In December 2012, Chevron relinquished its 29.2 percent nonoperated working interest in Exploration License 2007/26, which includes Block 4 offshore West Greenland.

Argentina: Chevron holds operated interests in four concessions in the Neuquen Basin. Working interests range from 18.8 percent to 100 percent. Net oil-equivalent production in 2012 averaged 22,000 barrels per day, composed of 21,000 barrels of crude oil and 4 million cubic feet of natural gas. During 2012, two exploratory wells targeting shale gas and tight oil resources were drilled in the Vaca Muerta formation in the El Trapial concession. In early 2013, a third exploratory well commenced drilling and the results of the previous wells were under evaluation. Chevron plans to drill three additional appraisal wells in 2013. The El Trapial concession expires in 2032.

Brazil: Chevron holds working interests in three deepwater fields in the Campos Basin: Frade (51.7 percent-owned and operated), Papa-Terra and Maromba (37.5 percent and 30 percent nonoperated working interests, respectively). Net oil-equivalent production in 2012 averaged 6,000 barrels per day, composed of 6,000 barrels of crude oil and 2 million cubic feet of natural gas.

In March 2012, production was suspended as a precautionary measure at the Frade Field while studies were conducted to better understand the geology in the area. Production is expected to partially resume in 2013 subject to necessary regulatory approvals. The concession that includes the Frade Field expires in 2025.

During 2012, construction activities and development drilling continued for the Papa-Terra project. The project includes a floating production, storage and offloading vessel (FPSO) and a tension leg wellhead platform, with a design capacity of 140,000 barrels of crude oil per day. First production is expected in second-half 2013. Proved reserves have been recognized for this project. Evaluation of the field development concept for Maromba continued in 2012 with submission of an initial Plan of Development to the authorities in September. At the end of 2012, proved reserves had not been recognized for this project. These concessions expire in 2032.

12

Colombia: The company operates the offshore Chuchupa and the onshore Ballena and Riohacha natural gas fields as part of the Guajira Association contract. In exchange, Chevron receives 43 percent of the production for the remaining life of each field and a variable production volume based on prior Chuchupa capital contributions. Daily net production averaged 216 million cubic feet of natural gas in 2012.

Suriname: In November 2012, Chevron acquired a 50 percent nonoperated working interest in Blocks 42 and 45 offshore Suriname. Under the agreements, the company would assume the role of operator in the event of commercial discoveries. In 2013, planned exploration activities include seismic data acquisition and processing.

Trinidad and Tobago: The company has a 50 percent nonoperated working interest in three blocks in the East Coast Marine Area offshore Trinidad, which includes the Dolphin and Dolphin Deep producing natural gas fields and the Starfish development. Net production in 2012 averaged 173 million cubic feet of natural gas per day. Development of the Starfish Field commenced in third quarter 2012, and first gas is expected in 2014. Natural gas from the project will supply existing contractual commitments. Proved reserves have been recognized for this project. Chevron also holds a 50 percent-owned and operated interest in the Manatee Area of Block 6(d) where the Manatee discovery comprises a single cross-border field with Venezuela's Loran Field in Block 2. In 2012, work continued on maturing commercial development concepts.

Venezuela: Chevron holds interests in two producing affiliates located in western Venezuela and one producing affiliate in the Orinoco Belt. Chevron has a 30 percent interest in the Petropiar affiliate that operates the Hamaca heavy-oil production and upgrading project located in Venezuela s Orinoco Belt, a 39.2 percent interest in the Petroboscan affiliate that operates the Boscan Field in the western part of the country, and a 25.2 percent interest in the Petroindependiente affiliate that operates the LL-652 Field in Lake Maracaibo. The company s share of net oil-equivalent production during 2012 from these operations averaged 68,000 barrels per day, composed of 64,000 barrels of liquids and 27 million cubic feet of natural

gas.

Chevron holds a 34 percent interest in the Petroindependencia affiliate that is working toward commercialization of Carabobo 3, a heavy-oil project located within the Carabobo Area of the Orinoco Belt. During 2012, work continued on conceptual engineering for the potential development project.

The company operates and has a working interest of 60 percent in Block 2 in the Plataforma Deltana area offshore eastern Venezuela, which includes the Loran Field. During 2012, work continued on maturing commercial development concepts.

Africa

In Africa, the company is engaged in upstream activities in Angola, Chad, Democratic Republic of the Congo, Liberia, Morocco, Nigeria, Republic of the Congo, Sierra Leone and South Africa. Net oil-equivalent production in Africa averaged 451,000 barrels per day during 2012.

Angola: Chevron holds company-operated working interests in offshore Blocks 0 and 14 and nonoperated working interests in offshore Block 2 and the onshore Fina Sonangol Texaco (FST) area. Net production from these operations in 2012 averaged 137,000 barrels of oil-equivalent per day.

The company operates the 39.2 percent-owned Block 0, which averaged 98,000 barrels per day of net liquids production in 2012. The Block 0 concession extends through 2030.

13

Work on the second development stage of the Mafumeira Field in Block 0 continued in 2012. Mafumeira Sul, a project to develop the southern portion of the field, reached a final investment decision in 2012. Development plans include a central processing facility, two wellhead platforms, subsea pipelines, and 34 producing and 16 water injection wells. First production is planned for 2015, with maximum total production expected to reach 110,000 barrels of crude oil and 10,000 barrels of liquefied petroleum gas (LPG) per day. The project is estimated to cost $5.6 billion. The initial recognition of proved reserves for this project occurred in 2012.

A project to develop the Greater Vanza/Longui Area of Block 0 is scheduled to enter FEED in second-half 2013. FEED activities continued during 2012 on the south extension of the N Dola Field development with a final investment decision expected in 2014. The facility is planned to have a design capacity of 28,000 barrels of crude oil per day. At the end of 2012, proved reserves had not been recognized for these projects.

Work continued in 2012 on the final stage of the Nemba Enhanced Secondary Recovery Stage 1 and 2 Project in Block 0. Installation activities are scheduled to begin in 2013, and project start-up is expected in early 2015. Maximum total production is expected to reach 13,000 barrels of oil-equivalent per day. Proved reserves have been recognized for this project.

Also in Block 0, drilling commenced on a post-salt/pre-salt dual objective exploration well in Area A in late 2012 and was completed in early 2013. The results are under evaluation. An additional pre-salt exploration well in Area A is planned for second-half 2013, along with one pre-salt and one post-salt appraisal well in Area B.

In the 31 percent-owned Block 14, net production in 2012 averaged 28,000 barrels of liquids per day. Development and production rights for the various producing fields in Block 14 expire between 2023 and 2028.

In June 2012, the project to develop the Lucapa Field in Block 14 entered FEED. Development plans include an FPSO and 17 subsea wells. The facility is planned to have a design capacity of 80,000 barrels of crude oil per day. A final investment decision is expected in 2014. During the year, development alternatives were evaluated for the Malange Field, and the project is expected to enter FEED in mid-2013. At the end of 2012, proved reserves had not been recognized for these projects.

In addition to the exploration and production activities in Angola, Chevron has a 36.4 percent interest in Angola LNG Limited, which will operate an onshore natural gas liquefaction plant in Soyo, Angola. The plant is designed to process 1.1 billion cubic feet of natural gas per day, with expected average total daily sales of 670 million cubic feet of natural gas and up to 63,000 barrels of NGLs. The plant reached mechanical completion, and commissioning activities continued through 2012. The first LNG shipment from the plant is expected to occur in second quarter 2013. The project is

estimated to cost $10 billion. The anticipated economic life of the project is in excess of 20 years. Proved reserves have been recognized for the producing operations associated with this project.

The company also holds a 38.1 percent interest in a pipeline project that is designed to transport up to 250 million cubic feet of natural gas per day from Block 0 and Block 14 to the Angola LNG plant. Construction on the project continued in 2012, and the project is expected to be completed in 2014.

Angola-Republic of the Congo Joint Development Area: Chevron operates and holds a 31.3 percent interest in the Lianzi development zone, located in an area shared equally by Angola and the Republic of the Congo. A final investment decision for the Lianzi development project was reached in July 2012. The project scope includes four producing wells and three water injection wells with a subsea tieback to an existing platform in Block 14. First production is anticipated in 2015, and maximum total daily production is expected to be 46,000 barrels of crude oil. The initial recognition of proved reserves for the project occurred in 2012.

Democratic Republic of the Congo: Chevron has a 17.7 percent nonoperated working interest in an offshore concession. Daily net production in 2012 averaged 3,000 barrels of oil-equivalent.

Republic of the Congo: Chevron has a 31.5 percent nonoperated working interest in the Haute Mer permit areas (Nkossa, Nsoko and Moho-Bilondo) and a 29.3 percent nonoperated working interest in the Kitina permit area, all of which are offshore. The licenses for Kitina, Nsoko, Nkossa and Moho-Bilondo expire in 2014, 2018, 2027 and 2030, respectively. Net production averaged 19,000 barrels of oil-equivalent per day in 2012.

FEED activities for the Moho Nord project, located in the Moho-Bilondo development area, continued in 2012. The project includes a new facilities hub and a subsea tieback to the existing Moho-Bilondo floating production unit. Maximum total daily production is expected to be 127,000 barrels of crude oil per day. A final investment decision is expected in first quarter 2013 and start-up is planned for 2015. At the end of 2012, proved reserves had not been recognized for this project.

Chad/Cameroon: Chevron has a 25 percent nonoperated working interest in crude oil producing operations in southern Chad, and an approximate 21 percent interest in two affiliates that own an export pipeline that transports crude oil to the coast of Cameroon. Average daily net production from the Chad fields in 2012 was 23,000 barrels of oil-equivalent. The Chad producing operations are conducted under a concession that expires in 2030.

14

Nigeria: Chevron holds a 40 percent interest in 13 concessions, predominantly in the onshore and near-offshore regions of the Niger Delta. The company operates under a joint-venture arrangement in this region with the Nigerian National Petroleum Corporation, which owns a 60 percent interest. The company also owns varying interests in four operated and six nonoperated deepwater blocks. In 2012, the company s net oil-equivalent production in Nigeria averaged 269,000 barrels per day, composed of 238,000 barrels of crude oil, 165 million cubic feet of natural gas and 4,000 barrels of LPG.

Chevron operates and holds a 67.3 percent interest in the Agbami Field, located in deepwater Oil Mining Lease (OML) 127 and OML 128. During 2012, drilling continued on a 10-well, Phase 2 development program, Agbami 2, that is expected to offset field decline and maintain plateau production. The first well in this program commenced production in second quarter 2012. The leases that contain the Agbami Field expire in 2023 and 2024.

The company holds a 30 percent nonoperated working interest in the deepwater Usan project in OML 138. Production commenced in first quarter 2012, and total daily production at year-end 2012 was 81,000 barrels of crude oil and 3 million cubic feet of natural gas. The facilities have a maximum total production capacity of 180,000 barrels of crude oil per day. The production-sharing contract (PSC) expires in 2023.

Also in the deepwater area, the Aparo Field in OML 132 and OML 140 and the third-party-owned Bonga SW Field in OML 118 share a common geologic structure and are planned to be jointly developed. The project is expected to enter FEED in 2013. At the end of 2012, no proved reserves were recognized for this project.

In the Niger Delta, the company reached a final investment decision in early 2013 on the Dibi Long-Term Project that is designed to rebuild the Dibi facilities and replace the Early Production System facility. The facilities are planned to have a maximum production capacity of 70,000 barrels of crude oil per day, and start-up is expected in 2016.

Also in the Niger Delta, ramp-up activity continued at the Escravos Gas Plant (EGP). During 2012, construction continued on Phase 3B of the EGP project, which is designed to gather 120 million cubic feet of natural gas per day from eight offshore fields and to compress and transport the natural gas to onshore facilities. The Phase 3B project is expected to be completed in 2016. Proved reserves associated with this project have been recognized.

The 40 percent-owned and operated Sonam Field Development is designed to process natural gas through EGP, deliver 215 million cubic feet of natural gas per day to the domestic market and produce a total of 30,000 barrels of liquids per day. First production is expected in 2016. Proved reserves have been recognized for the project.

Chevron has a 75 percent-owned and operated interest in a gas-to-liquids facility at Escravos that is being developed with the Nigerian National Petroleum Corporation. The 33,000-barrel-per-day facility is designed to process 325 million cubic feet per day of natural gas supplied from the Phase 3A expansion of EGP. As of early 2013, overall work on the project was more than 89 percent complete and start-up is planned for late 2013. The estimated cost of the plant is $9.5 billion.

The company has a 40 percent-owned and operated interest in the Onshore Asset Gas Management project that is designed to restore approximately 125 million cubic feet per day of natural gas production from certain onshore fields that have been shut in since 2003 due to civil unrest. Construction was completed in third quarter 2012, and start-up commenced in late 2012.

In deepwater exploration, the company has a 27 percent nonoperated working interest in Oil Prospecting License (OPL) 223 where an exploration well was drilled in third quarter 2012. In addition, Chevron operates and holds a 95 percent interest in the deepwater Nsiko discovery in OML 140. Additional exploration activities are planned for 2013 and 2014.

Shallow-water exploration activities in 2012 included reprocessing 3-D seismic data from OML 86 and OML 88 and regional mapping activities.

With a 36.7 percent interest, Chevron is the largest shareholder in the West African Gas Pipeline Company Limited affiliate, which owns and operates the 421-mile West African Gas Pipeline. The pipeline supplies Nigerian natural gas to customers in Benin, Ghana and Togo for industrial applications and power generation and has the capacity to transport 170 million cubic feet per day.

Liberia: Chevron operates three deepwater blocks off the coast of Liberia. In July 2012, the company farmed down its interest from 70 percent to 45 percent in these blocks. Exploration wells were drilled in blocks LB-11 and LB-12 during 2012. In 2013, the company plans to mature drilling prospects based on the evaluation of 2012 drilling results and 3-D seismic data.

15

Morocco: In early 2013, the company entered into agreements to acquire a 75 percent operated interest in three deepwater areas offshore Morocco. The areas, Cap Rhir Deep, Cap Cantin Deep and Cap Walidia Deep, encompass approximately 7.2 million acres. Once the award is finalized, acquisition of seismic data is planned.

Sierra Leone: In September 2012, the company announced that it had been awarded operatorship and a 55 percent interest in a concession off the coast of Sierra Leone. The concession contains two deepwater blocks, with a combined area of approximately 1.4 million acres. Acquisition of 2-D seismic data is planned for 2013.

South Africa: In December 2012, the company entered into an agreement to seek shale gas exploration opportunities in the Karoo Basin in South Africa. This agreement allows Chevron and its partner to work together over a five-year period to obtain exploration permits in the 151 million-acre basin.

Asia

In Asia, the company is engaged in upstream activities in Azerbaijan, Bangladesh, Cambodia, China, Indonesia, Kazakhstan, the Kurdistan Region of Iraq, Myanmar, the Partitioned Zone located between Saudi Arabia and Kuwait, the Philippines, Russia, Thailand, and Vietnam. During 2012, net oil-equivalent production averaged 1,061,000 barrels per day.

Azerbaijan: Chevron holds an 11.3 percent nonoperated working interest in the Azerbaijan International Operating Company (AIOC), which produces crude oil from the Azeri-Chirag-Gunashli (ACG) project. The company s daily net

production from AIOC averaged 28,000 barrels of oil-equivalent in 2012. AIOC operations are conducted under a PSC that expires in 2024.

During 2012, construction progressed on the next development phase of the ACG project, which will further develop the deepwater Gunashli Field. The total estimated cost of the project is $6 billion, with an incremental targeted maximum total daily production of 103,000 barrels of oil-equivalent. Production is expected to begin in late 2013. Proved reserves have been recognized for this project.

Chevron also has an 8.9 percent interest in the Baku-Tbilisi-Ceyhan (BTC) affiliate, which owns and operates a crude oil export pipeline from Baku, Azerbaijan, through Georgia to Mediterranean deepwater port facilities at Ceyhan, Turkey. The BTC Pipeline has a capacity of 1.2 million barrels per day and transports the majority of ACG production. Another production export route for crude oil is the Western Route Export Pipeline, wholly owned and operated by AIOC, with capacity to transport 100,000 barrels per day from Baku, Azerbaijan, to a marine terminal at Supsa, Georgia.

Kazakhstan: Chevron participates in two major upstream developments in western Kazakhstan. The company holds a 50 percent interest in the Tengizchevroil (TCO) affiliate, which is operating and developing the Tengiz and Korolev crude oil fields under a concession that expires in 2033. Chevron s net oil-equivalent production in 2012 from these fields averaged 286,000 barrels per day, composed of 218,000 barrels of crude oil, 301 million cubic feet of natural gas and 18,000 barrels of NGLs. During 2012, the majority of TCO s crude oil production was exported through the Caspian Pipeline Consortium (CPC) pipeline that runs from Tengiz in Kazakhstan to tanker-loading facilities at Novorossiysk on the Russian coast of the Black Sea. The balance was exported via rail to Black Sea ports.

In 2012, FEED activities were initiated for three projects. The Wellhead Pressure Management Project is designed to maintain production capacity and extend the production plateau from existing assets. The Capacity and Reliability Project is designed to reduce facility bottlenecks and increase plant efficiency and reliability. The Future Growth Project is designed to increase total daily crude oil production by 250,000 to 300,000 barrels of oil-equivalent and to increase the ultimate recovery of the reservoir. The project will expand the utilization of sour gas injection technology proven in existing operations. The final investment decisions on these projects are planned for late 2013. At the end of 2012, proved reserves have only been recognized for the Wellhead Pressure Management Project.

Also at TCO, start-up commenced on the Sulfur Expansion Project in December 2012. This project is designed to eliminate routine additions to sulfur inventory.

16

In June 2012, the company's nonoperated working interest in the Karachaganak Field was reduced from 20 percent to 18 percent as a result of a 2011 agreement with the Republic of Kazakhstan government. Operations and development of the field are conducted under a PSC that expires in 2038. During 2012, Karachaganak net oil-equivalent production averaged 61,000 barrels per day, composed of 37,000 barrels of liquids and 139 million cubic feet of natural gas. Access to the CPC and Atyrau-Samara (Russia) pipelines enabled approximately 35,000 net barrels per day of Karachaganak liquids to be exported and sold at world-market prices during 2012. The remaining liquids were sold into local and Russian markets. During 2012, work continued on identifying the optimal scope for the future expansion of the field. At the end of 2012, proved reserves had not been recognized for any further expansion.